HVAC Commissioning, Water Treatment
& L8 Legionella Compliance Specialist

LONDON 0207 608 5535
EAST KILBRIDE 01355 267199
HVAC Commissioning
WATER TREATMENT
HVAC Commissioning

Service: HVAC Commissioning & Water Treatment

Project: Faith School Campus

Client: Marmac Services

Cleartech were engaged by Marmac Services to carry out the HVAC commissioning and water treatment at the new Faith School Campus in Newton Mearns. The £13.8m project brings together two denominational primary schools with provision for a nursery and will serve as a replacement for Calderwood Lodge and an additional Catholic School. The first of its kind, this new campus will welcome both Jewish and Catholic pupils under the one roof and although teaching blocks and entrances will be separate for each school, all pupils can share a flexible meeting place, situated around an amphitheater.

HVAC commissioning

 

 

 

 

 

 

 

Additional features include an open atrium, which is designed to hold multiple functions, an assembly and sports hall, outdoor terraces, additional learning spaces,  an innovative interactive space, a nursery class, playground and dining facilities, which provide Kosher catering.

Project Overview

Scope of Works:

  • Cleaning & chlorination of new installation CWST & associated hot & cold water services
  • Full pre-commission chemical clean, static flushing, biocide wash & dynamic flushing
  • Setting TMVs
  • Proportional balancing of AHU1 supply & extract
  • Potable water samples taken and tested at UKAS accredited laboratory
  • Water & ventilation balancing of systems

 

Cleartech’s Approach

Our full scope of works included cleaning and chlorination of new installation of 1x CWST and 294 associated hot and cold water services to BS8558 Specification at the Faith School Campus. Multiple potable water samples were taken and tested at a UKAS accredited laboratory and results were issued to our client. We also carried out a full pre-commission chemical clean, static flushing, biocide wash, dynamic flushing and dosing of corrosion inhibitor fully in accordance with BSRIA BG 29/2012 Pre-commission Cleaning of Pipework Systems. The estimated water content of the LTHW heating installation at the campus was 10,000 litres and all LTHW chemical cleaning, flushing, back flushing and dosing works were inclusive of boilers, calorifiers, UFH manifolds and radiant panels.

Our HVAC commissioning works included carrying out water and ventilation balancing of systems as dictated by the project specification. All works were carried out as per C.I.B.S.E code ‘A’ and ‘W’, complete with final report. The systems comprised of pumps, commissioning sets, AHUs, HRUs, Ex fans, S grilles, Ex grilles, CAV/VAVs and TMVs. Cleartech invest considerable time, effort and resources in developing the expertise of our engineers and ensuring that all work is completed fully within regulation guidelines so if you have a project that requires our services then contact us today.

For further information or advice on HVAC commissioning and water treatment, or for a quote, call today on 01355 267199, send an email to info@cleartech.org.uk or submit a contact form on our website.

Click the graphic to view or download our Faith School Campus case study.
faith school

< BACK TO CASE STUDIES

CONTACT US

EAST KILBRIDE

17 Langlands Avenue
Kelvin South Business Park
East Kilbride
G75 0YG
TEL: 01355 267199
CONTACT US

LONDON

20-22 Wenlock Road
London
N1 7GU
TEL: 0207 608 5535
CONTACT US

NEWSLETTER SIGN UP

Add your email in the box below, to receive the latest news and information on our services from Cleartech