HVAC Commissioning, Water Treatment
& L8 Legionella Compliance Specialist

LONDON 0207 608 5535
EAST KILBRIDE 01355 267199
HVAC Commissioning
WATER TREATMENT
HVAC Commissioning

Service: HVAC Commissioning & Water Treatment

Project: Forfar Community Campus

Client: Sparks Mechanical

Cleartech were engaged by Sparks Mechanical to carry out the HVAC commissioning and water treatment at the new Forfar Community Campus in Angus, Scotland. Opening in February, 2017, the campus accommodates a variety of facilities, including: Forfar Academy, Angus Alive and the Dundee and Angus Council community team. The residents of Forfar were incorporated in to the build plans from the beginning, in order to ensure that the campus could meet the needs of the nearby residents.

Project Overview

Scope of Works:

  • Cleaning & chlorination of new installation hot and cold water services
  • Full pre-commission chemical clean, static flushing, biocide wash & dynamic flushing
  • Dosing of corrosion inhibitor
  • Water and ventilation balancing of systems
  • Potable water samples taken and tested at UKAS accredited laboratory

 

Cleartech’s Approach

Our full scope of works included cleaning and chlorination of new installation hot and cold water services to BS8558 Specification at the Forfar Community Campus. Multiple potable water samples were taken and tested at a UKAS accredited laboratory and results were issued to our client. We also carried out a full pre-commission chemical clean, static flushing, biocide wash, dynamic flushing and dosing of corrosion inhibitor fully in accordance with BSRIA BG 29/2012 Pre-commission Cleaning of Pipework Systems. The estimated water content of the LTHW heating installation at the community campus was 38,200 litres and treatment chemicals used included biocide, polymer and corrosion inhibitor.

Our HVAC commissioning works included carrying out water and ventilation balancing of systems as dictated by the project specification. All works were carried out as per C.I.B.S.E code ‘A’ and ‘W’, complete with final report. The systems comprised of pumps, commissioning sets, AHU’s, Ex fans, S fans, T Ex fans, S grilles, Ex grilles, Ex Canopys and T Ex grilles. Cleartech invest considerable time, effort and resources in developing the expertise of our engineers and ensuring that all work is completed fully within regulation guidelines so if you have a project that requires our services then contact us today.

For further information or advice on HVAC commissioning and water treatment, or for a quote, call today on 01355 267199, send an email to info@cleartech.org.uk or submit a contact form on our website.

Click the graphic to view or download our Forfar Community Campus case study.

Forfar CC

< BACK TO CASE STUDIES

CONTACT US

EAST KILBRIDE

17 Langlands Avenue
Kelvin South Business Park
East Kilbride
G75 0YG
TEL: 01355 267199
CONTACT US

LONDON

20-22 Wenlock Road
London
N1 7GU
TEL: 0207 608 5535
CONTACT US

NEWSLETTER SIGN UP

Add your email in the box below, to receive the latest news and information on our services from Cleartech