HVAC Commissioning, Water Treatment
& L8 Legionella Compliance Specialist

LONDON 0207 608 5535
EAST KILBRIDE 01355 267199
HVAC Commissioning
WATER TREATMENT
HVAC Commissioning

Service: HVAC Commissioning and Water Treatment

Project: Hampton by Hilton Aberdeen Airport & Westhill

Client: Hutcheon Services Ltd & Robertson Construction

Cleartech were engaged by Hutcheon Services Ltd and Robertson Construction to carry out the HVAC commissioning and water treatment works at the new Hampton by Hilton at Aberdeen Airport and Hampton by Hilton Westhill. Hampton by Hilton Aberdeen Airport, with 155 bedrooms, is now welcoming guests following its construction on the D2 Business Park at Dyce. The Westhill Hotel boasts 173 rooms and hosted a successful opening at the beginning of May, following a build time of around 44 weeks. The two hotels are the quickest built Hilton branded hotels in the UK. This investment by international property developer Bricks Capital adds more than 300 rooms to an increasingly competitive hotel market in and around Aberdeen.

Project Overview

Our HVAC Commissioning & Water Treatment services include:

  • Closed System Flushing
  • Cleaning & chlorination of new installation hot & cold water systems
  • Potable water samples taken & tested at laboratory
  • Pre-sterilisation, cleaning & post-sterilisation of DWS & DHWS
  • Full pre-commission chemical clean, static flushing, biocide wash, dynamic flush & dosing of corrosion inhibitor
  • pre-commissioning cleaning of pipework system
  • TMV testing & setting
  • Water & ventilation balancing of LTHW systems

 

Cleartech’s Approach

For this project, we worked with our clients to devise a unique service package that would ensure work was completed on time, within budget and of a high quality standard. These works included; cleaning and chlorination of new installation hot and cold water services  to BS8558 Specification and Cleartech Specification 02 and 04 and testing potable water samples at a UKAS accredited laboratory. We also carried out a full pre-commission chemical clean, static flushing, biocide wash, dynamic flushing & dosing of corrosion inhibitor fully in accordance with BSRIA BG 29/2012. Furthermore,  we conducted pre-commissioning cleaning of pipework systems and as per Cleartech specification 012.
For further information or advice on HVAC commissioning and water treatment, or for a quote, call today on 01355 267199, send an email to info@cleartech.org.uk or submit a contact form on our website.

Click the graphic to view or download the Hampton by Hilton case study.
Hampton by hilton

 

< BACK TO CASE STUDIES

CONTACT US

EAST KILBRIDE

17 Langlands Avenue
Kelvin South Business Park
East Kilbride
G75 0YG
TEL: 01355 267199
CONTACT US

LONDON

20-22 Wenlock Road
London
N1 7GU
TEL: 0207 608 5535
CONTACT US

NEWSLETTER SIGN UP

Add your email in the box below, to receive the latest news and information on our services from Cleartech